Grange Solar Grazing Center: Application to OPSB
The Grange Solar Grazing Center submitted its application to the Ohio Power Siting Board on October 11th. This page includes links to and explanations of the various reports, studies, and figures that comprise the Application. These same docments can all be found on the Grange Solar Grazing Center docket page (Case Record 24-0801-EL-BGN). OPSB Staff will review this Application for the next 150 days and will issue a summary of its findings.
If you have any questions about the Grange project or this application, please reach out at grange@openroadrenewables.com or call us at 937-633-0224.
Links to Application Components
These links lead to individual web pages hosting components of the Grange Solar Grazing Center Application. Each page has a flip-book viewer to allow ease of review of the report. You can also download reports directly from the OPSB docket page for Grange.
Exhibit A - Preliminary-Maximum Site Plan
Exhibit B - Representative Component Models
Exhibit C - Vegetation Management Plan
Exhibit E - Interconnection Reports
Exhibit G - Summary of Public Outreach
Exhibit H - Complaint Resolution Program
Exhibit I - Transportation Assessment
Exhibit J - Decommissioning Plan
Exhibit K - General Construction Permit
Exhibit L - Stormwater Analysis
Exhibit M - Solid Waste Analysis
Exhibit P - Geology/Hydrogeology Report
Exhibit S - Radio and TV Analysis
Exhibit U - Microwave Analysis
Exhibit V - Surface Water Delineation
Exhibit X - Ecology Impact Report
Exhibit Y - Cultural Methodology
Exhibit Z - Historic Resources Study
Exhibit AA - Archaeology Study
Exhibit BB - Visual Resources Assessment